Noticias de la categoría Fotovoltaica

  • strict warning: Non-static method view::load() should not be called statically in /home/virtual/emar.us/var/www/html/sites/default/modules/views/views.module on line 843.
  • strict warning: Declaration of views_plugin_display::options_validate() should be compatible with views_plugin::options_validate(&$form, &$form_state) in /home/virtual/emar.us/var/www/html/sites/default/modules/views/plugins/views_plugin_display.inc on line 27.
  • strict warning: Declaration of views_plugin_display_page::options_submit() should be compatible with views_plugin_display::options_submit(&$form, &$form_state) in /home/virtual/emar.us/var/www/html/sites/default/modules/views/plugins/views_plugin_display_page.inc on line 13.
  • strict warning: Declaration of views_handler_field_broken::ui_name() should be compatible with views_handler::ui_name($short = false) in /home/virtual/emar.us/var/www/html/sites/default/modules/views/handlers/views_handler_field.inc on line 623.
  • strict warning: Declaration of content_handler_field::options() should be compatible with views_object::options() in /home/virtual/emar.us/var/www/html/sites/default/modules/cck/includes/views/handlers/content_handler_field.inc on line 13.
  • strict warning: Declaration of views_handler_argument::init() should be compatible with views_handler::init(&$view, $options) in /home/virtual/emar.us/var/www/html/sites/default/modules/views/handlers/views_handler_argument.inc on line 33.
  • strict warning: Declaration of views_handler_argument_broken::ui_name() should be compatible with views_handler::ui_name($short = false) in /home/virtual/emar.us/var/www/html/sites/default/modules/views/handlers/views_handler_argument.inc on line 752.
  • strict warning: Declaration of views_handler_sort_broken::ui_name() should be compatible with views_handler::ui_name($short = false) in /home/virtual/emar.us/var/www/html/sites/default/modules/views/handlers/views_handler_sort.inc on line 64.
  • strict warning: Declaration of views_handler_filter::options_validate() should be compatible with views_handler::options_validate($form, &$form_state) in /home/virtual/emar.us/var/www/html/sites/default/modules/views/handlers/views_handler_filter.inc on line 17.
  • strict warning: Declaration of views_handler_filter::options_submit() should be compatible with views_handler::options_submit($form, &$form_state) in /home/virtual/emar.us/var/www/html/sites/default/modules/views/handlers/views_handler_filter.inc on line 17.
  • strict warning: Declaration of views_handler_filter_broken::ui_name() should be compatible with views_handler::ui_name($short = false) in /home/virtual/emar.us/var/www/html/sites/default/modules/views/handlers/views_handler_filter.inc on line 591.
  • strict warning: Declaration of views_handler_filter_node_status::operator_form() should be compatible with views_handler_filter::operator_form(&$form, &$form_state) in /home/virtual/emar.us/var/www/html/sites/default/modules/views/modules/node/views_handler_filter_node_status.inc on line 6.
  • strict warning: Declaration of views_plugin_style_default::options() should be compatible with views_object::options() in /home/virtual/emar.us/var/www/html/sites/default/modules/views/plugins/views_plugin_style_default.inc on line 14.
  • strict warning: Declaration of views_plugin_row::options_validate() should be compatible with views_plugin::options_validate(&$form, &$form_state) in /home/virtual/emar.us/var/www/html/sites/default/modules/views/plugins/views_plugin_row.inc on line 25.
  • strict warning: Declaration of views_plugin_row::options_submit() should be compatible with views_plugin::options_submit(&$form, &$form_state) in /home/virtual/emar.us/var/www/html/sites/default/modules/views/plugins/views_plugin_row.inc on line 25.
  • strict warning: Non-static method view::load() should not be called statically in /home/virtual/emar.us/var/www/html/sites/default/modules/views/views.module on line 843.
  • strict warning: Declaration of views_plugin_display_block::options_submit() should be compatible with views_plugin_display::options_submit(&$form, &$form_state) in /home/virtual/emar.us/var/www/html/sites/default/modules/views/plugins/views_plugin_display_block.inc on line 13.
  • strict warning: Declaration of views_handler_filter_boolean_operator::value_validate() should be compatible with views_handler_filter::value_validate($form, &$form_state) in /home/virtual/emar.us/var/www/html/sites/default/modules/views/handlers/views_handler_filter_boolean_operator.inc on line 13.
  • strict warning: Non-static method view::load() should not be called statically in /home/virtual/emar.us/var/www/html/sites/default/modules/views/views.module on line 843.
  • strict warning: Non-static method view::load() should not be called statically in /home/virtual/emar.us/var/www/html/sites/default/modules/views/views.module on line 843.
27 | 08 | 2012

Ingeniería EMAR esta finalizando la asesoría técnica y puesta en funcionamiento de más de un 1MW en instalaciones fotovoltaicas, correspondiente a dos instalaciones en la provincias de Córdoba y de Huelva. Estas instalaciones estaban inscritas en la tercera convocatoria de 2011 e Ingeniería EMAR se ha encargado desde el comienzo de la Ingeniería y tramitación de ambos proyectos.


06 | 06 | 2012

La locomotora europea lo tiene claro. La alternativa al apagón nuclear –anunciado por la canciller Angela Merkel poco después de sucedida la catástrofe de Fukushima– es la energía renovable. Más aún, según el último barómetro fotovoltaico de EurObserv'ER, Alemania ha añadido a su parque FV nacional nada menos que 14.900 MW fotovoltaicos en el último bienio (2010-2011), lo que la señalan como la nación del mundo que más potencia FV ha instalado durante ese periodo, por delante incluso de la inmensa China. ¿El último ejemplo? La multinacional alemana Conergy, que, tras la reciente inauguración de su parque de Grimmen (ocho megavatios), anuncia ahora "la realización del proyecto fotovoltaico más grande del estado alemán de Sarre" (noroeste de Stuttgart).


11 | 05 | 2012

EPIA dio a conocer "Perspectivas del mercado mundial de energía fotovoltaica hasta 2016", un análisis fidedigno de los mercados de energía fotovoltaica en Europa y en todo el mundo; Italia, Alemania son los principales mercados europeos.


22 | 02 | 2012

Familias, vecinos y municipios podrían ahorrase desde este año las subidas en el precio final de la electricidad. La afirmación es de la Unión Española Fotovoltaica (UNEF) que propone el “autoconsumo por balance neto”. La única herramienta que falta, asegura, es una legislación adecuada. Adiós a la subida del recibo de la luz.


11 | 11 | 2011

El Ministerio de Industria, ha resuelto el procedimiento de preasignación de retribución para convocatoria del tercer trimestre de 2011.


22 | 07 | 2011

Hoy día 20 de julio de 2011, el Ministerio de Industria, ha resuelto el procedimiento de preasignación de retribución para convocatoria del segundo trimestre de 2011.


05 | 07 | 2011

La fotovoltaica con 3.873 MW y la termosolar 800 Mw conectados han batido el record del mes anterior que se produjo en el mes de mayo cubriendo el 4,5 % de la demanda eléctrica.


17 | 05 | 2011

La estimación realizada por de EurObserv’ER en 2010 indica que la energía solar fotovoltaica fue líder en cuanto a la instalación de potencia renovable en la Unión Europea. Se superaron los 13 GW, con un crecimiento de mercado del 120% en comparación con el año 2009.


04 | 04 | 2011

Se recoge a continuación la Resolución de 28 de marzo de 2011 de la Dirección General  de Política Energética y Minas, por la que se inscriben en el Registro de preasignación de retribución, asociados a la convocatoria del primer trimestre de 2011, los proyectos incluidos en los cupos correspondientes y se publica el resultado del procedimiento de preasignación de retribución de dicha convocatoria, de acuerdo a lo previsto en el Real Decreto 1578/2008, de 26 de septiembre.


30 | 03 | 2011

El Consejo de la Comisión Nacional de la Energía (CNE) ha decidido la suspensión cautelar de la prima a 350 instalaciones fotovoltaicas. El motivo es “que no han acreditado la instalación de los equipos necesarios para la producción de energía eléctrica a fecha 30 de septiembre de 2008”. Más claramente, habrían cobrado irregularmente la prima que fijaba el RD 661/2007, más elevada que la tarifa establecida en el RD 1578/2008, que le sustituyó. La potencia de todas ellas suma 32,55 MW.


Distribuir contenido